An empty role isn't free, because the work still gets done. Someone covers it with overtime, a contractor holds the fort, a manager drops their own job, and output slips. Take away the salary you're not paying and what's left is the real cost. For a maintenance planner off the floor for 12 weeks, that can be about $42,000.
Why most businesses get this number wrong
When a role sits empty, it can feel like the business is saving money. There's no salary going out. But the work doesn't stop. It moves, and most of it moves to more expensive places: overtime rates, contractor day rates, a manager's time, and the cost of things going wrong more often.
None of that sits on one line of the P&L, which is why so few businesses ever add it up.
The four costs of a vacancy
- Overtime cover. The team picks up the work, usually at time and a half or double time.
- Contractor cover. A contract planner, engineer or supervisor holds the fort, at a day rate.
- Lost output. Deferred maintenance, slower fault-finding, quotes that go out late and orders that ship late. On a plant floor, this is usually the biggest cost.
- Manager time. Your manager does part of the role, interviews and onboards, instead of their own work.
Then take away the salary you're not paying. What's left is the real extra cost of the vacancy.
A worked example: a maintenance planner
A maintenance planner on $105,000 (inside the $90,000 to $120,000 range in the Giide salary guide), vacant for 12 weeks. These are example figures, not a benchmark:
| Cost | Example assumption | Per week |
|---|---|---|
| Overtime cover | 12 hours a week at time and a half, on a $58 base rate | $1,044 |
| Extra unplanned downtime | 3 hours a month at $6,000 an hour | $4,154 |
| Manager time | 6 hours a week at $95 an hour | $570 |
| Less salary not paid | $105,000 plus 12% super, ÷ 52 | −$2,262 |
| Real extra cost | $3,506 a week |
Over 12 weeks, that's about $42,000, or $700 every working day. Fill the role four weeks sooner and you save about $14,000.
And that leaves out the costs that are hardest to count: the knowledge that walks out with the last person, fatigue and safety risk in a stretched team, failures that turn up months after a missed service, and the next resignation from someone who's been carrying the load. Most of these push the real figure higher.
The cost of filling it in a hurry
The weekly cost is what pushes businesses into a rushed hire, and that's where the bigger cost sits. A hire who doesn't last means paying for the gap twice: the vacancy you just had, and the next one, plus the time spent training someone who leaves. Filling a role well is usually cheaper than filling it fast.
Work out your own number
Use our Cost of Vacancy Calculator with your own figures: the role, the salary, the cover, and the downtime or lost sales. It takes about five minutes, and you can copy the result straight into a business case for the role.
Why we're writing about this
A vacancy is easier to act on once it has a number attached. We'd rather you made the call on the role with real figures in front of you, whether you fill it yourself or with us.
Common questions
Is a vacancy cheaper than a salary?
Rarely, for a role that matters to output. Once overtime, contractor cover, lost output and manager time are counted, an empty seat usually costs more than the salary you're saving.
What's the biggest cost of a vacancy?
On a plant floor, it's usually lost output: unplanned downtime, slower fault-finding and late orders. In sales, it's the revenue from the territory nobody's working.
How do I work out the cost of downtime?
Your operations or finance lead will have a figure for one hour of lost production, idle crews and restart costs. Use that in the calculator.
Example figures are illustrative, not a benchmark. Salary range: Giide salary guide, November 2026. Super at 12%, the superannuation guarantee rate from 1 July 2025. Last checked 14 November 2026.
